tony-fr-si Posted January 10, 2005 Report Share Posted January 10, 2005 I've recently installed, i.e., upgraded to Nero 6603. The problem is that NERO can't run a job that is setup to execute weekly, more than 2-times.----------------------------------------------------------------------------------------------After running the second calendar week, the Nero job is no longer in the que! It's as if I went in and deleted the job.Can any one shed some light on this job scheduling problem??????thxs ..... Quote Link to comment Share on other sites More sharing options...
-pops- Posted January 11, 2005 Report Share Posted January 11, 2005 Strange one!I wonder if this is general? Have you asked Nero about it? If they are aware of it, they may be able to offer a solution. If they are not aware of it, they would be interested in knowing about it. Quote Link to comment Share on other sites More sharing options...
nellie2 Posted January 12, 2005 Report Share Posted January 12, 2005 I think tony-fr-si meant to reply with the following, but he pressed the wrong button! We've all done it! :P I've already e-mailed the nero product support center. The neither called or e-mailed me back!!!!! Quote Link to comment Share on other sites More sharing options...
homecomputeraid Posted January 12, 2005 Report Share Posted January 12, 2005 Tony-fr-si,What Operating System? Windows XP Home or Pro? Other?If you let me know, I'll try it and see what happens. My Nero version is considerably older than yours though.Sincerely, Quote Link to comment Share on other sites More sharing options...
tony-fr-si Posted January 13, 2005 Author Report Share Posted January 13, 2005 Ted:My PC profile follows:MS Windows XP PRO with SP2Pentium (4) CPU2.60 GHz4.96 MBs of RAMNero Product Center Displayed On My Version Of Nero:NERO OEM 6.6.0.3InCD 4.3.0.5For your information:The above two members were only updates required!Thxs for your HELP! Quote Link to comment Share on other sites More sharing options...
homecomputeraid Posted January 13, 2005 Report Share Posted January 13, 2005 Tony,Thanks for the info!Are you scheduling this through Windows Task Scheduler, or does the new Nero software contain a scheduled backup utility? My Nero has no such option that I can find. I have version 5.5 though. Quote Link to comment Share on other sites More sharing options...
tony-fr-si Posted January 13, 2005 Author Report Share Posted January 13, 2005 Ted,Nero has its own automatic job scheduling backup utility! There are (3) options:1) Job that executes each day at a specific time.2) Job that executes each week at a specific time.3) Job that executes on a specific date and time. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.