Jump to content

So, did you get off your lazy............


deuces wild
 Share

Recommended Posts

..........arse and get anything accomplished yesterday (Saturday)?

I did. :blush:

I got the mowers started for the season (my son's job to mow the lawn, and he did so today), put the summer deck furniture out, cleaned out the shed, coated (boiled linseed oil) an outside rocker and waxed/detailed my wifes car. Just finished up at 9:30 p.m. and I am tired.

Tomorrow I plan to clean and power wash the deck (my wife agreed to stain it if I did this).

Now I am not saying I am a hard worker all year......you can usually find me on the couch in front of the tv during the winter. During the summer I am usually outside on the hammock watching a baseball game while drinking my favorite brew (beer).

I just got motivated this weekend as the weather was fine and the work had to be done. Next weekend I will probably power wash the house and clean the windows. In a couple of weeks my son and I will be leveling out our backyard (we have low spots causing flooding in those areas). I will be renting a small bobcat to transfer quite of bit of topsoil to the back yard. We will then regrade it towards the sewer drains and re-seed it.

After that it is a summer of leisure....baseball, beer and boating/swimming. :D

So did you get anything done this weekend and are you ready for summer? :)

What sort of work do you still have to do?

How do you plan to chill for the summer?

:) :P

Link to comment
Share on other sites

I did a 4 mile jog. Just starting to get into training for this years Great North Run. Training has suffered for a number of reasons up 'till now, so it's hard going. Yesterday was the start of a big improvement. Felt more of a bounce in my stride rather than a heavy plod. Knocked 7 mins off last weeks time. Still a pathetic 11.4 mins/mile. Aiming to get down to under 9 mins/mile.

Then started repairing some lawn edges and finished off deheading all the Daffs.

Link to comment
Share on other sites

Emptied the the main attic ..... and got rid of the remaining laths and plaster from my upstairs front bedroom ..... this is the fourth room Ive stripped out in 4 weeks ...

My smaller attics going to be hard work , as the previous owners , when they re-roofed it ....put all of the slates into it ,theres a whole roof in there , probably with an eye to selling it ...

...Im a bit worried about the weight , but if its been in there 30 years , I guess its OK ..Ill wait till I pull the ceiling out in the room below.. because it will be a mission .

some piccies

check out the Victorian wallpaper , Ive found under about 5 layers , Its a s*** brown ...This is in the hallway and all the landings (must be about 130 years old) must have made the house very dark !.... Ive also a second redundant water tank in the ceiling , to big to move without having to cut it up .......that should be fun ! .....

There was no fireplace in this room (under the MDF) , One of my back rooms had a white marble and tile one which had been covered up ... It was the only original that was left in the house ...... Its a pity that the others have been stripped out ..

ah well

post-137-1113739768_thumb.jpg

post-137-1113739809_thumb.jpg

post-137-1113739828_thumb.jpg

post-137-1113739880_thumb.jpg

Link to comment
Share on other sites

So, Tankus, that's your spare time sorted out for the forseeable future ten!

Been there and done all that a few times........ :rolleyes:

I concentrated on the garden - got some cheap plans from the market and pricked out loads of seedlings - that was besides the cooking, cleaning, ironing, shopping etc.................... :)

Link to comment
Share on other sites

Heh ....it looks sooo easy when you see it on the TV makeover programmes , but plaster dust is a bastard ....... and it weighs a ton ...... the downstairs front ceiling was 3/4 inch thick .......

My first scary moment was finding structural failure in the front bay window ...(pic 1 close...and pic 3) the joist supports the whole front of the upstairs and roof ....and there is a crack in it about 4 foot long , along the length of the beam ..... I was thinking thousands .... Ive had my first quote for £550 to replace it with structural steel ...and replace the bay roof ...... which I can see daylight through .... seems reasonable

Building insurance will not cough up for it ...though .....ah well

The crack is not fresh , plus there are some bodge job bolts alongside it so it must have been there when the bay roof was replaced ..... so it must be fairly stable

The last piccy ....pulling out a thin hardboard covering there was a complete set of solid (oak..?) doors underneath joining the back room ....... think Ill keep them ...strip and sand them down and re-stain and varnish with a lighter colour wood stain ..... I hope it works ..... because although the qualities good they are far to dark .....

Not just some spare time artist .!.Im doing the whole house, inc. new kitchen and 2 bathroom's.. looks like I'm going to be living in a bomb-site for months...OMG.. a year ? ..arf ..... I'm going to turn the cellar into a bedsit too.... poss with en-suit ...depending whats left in me wallet ..... The attic is ideal for another room , nice and tall......... my neighbours having it done now ....but its costing them £30 grand inc. dormer in the back ...blimey . think Ill give it a miss.. I may just board it over , and put some retractable stairs in , because I'm losing the storage in the cellar ....

post-137-1113741825_thumb.jpg

post-137-1113741867_thumb.jpg

post-137-1113741921_thumb.jpg

post-137-1113741996_thumb.jpg

Link to comment
Share on other sites

4 weeks, so far , things are a bit on hold at the moment until the steel beam's sorted ....... no... the hallway wall is just a stud , the only structual wood are the floor beams , all the vertical are brick , ....the "groves" (actually its just discoloured) are where the laths were attached (Nailed) and the plaster was applied on top ... Its Victorian , they never used plasterboards ...wooden slats then a rough plaster 1/2 thick , then skimmed with a finish fine plaster on top ....... pulling out all the nails holding the whole thing together took a whole day in itself ....

If you look at the fourth picture you can see the laths (horizontal) in the hole in the wall ....

The dogs (Gnasher) my lodgers ...... OK for me ...Its like having a pet with no responsibility ..arf

Link to comment
Share on other sites

We've done three in this area - fed up with it now. Each one needed almost gutting and as bungalows are not huge - we extended into the loft in each one and extended outwards too.

All three took almost a year each to do............plenty of short tempers during that time. It's a wonder we're still together!

:D

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue. Privacy Policy